Key takeaways
- The process starts with a conversation and a measurement.
- Custom glass is made after measuring, so there is a wait.
- Installation is usually a single visit with cleanup.
- You get a walk-through on use and care.
The first call and visit
You tell us about the bathroom and what you want. We visit, look at the opening and talk about door types, glass and hardware.
We measure and confirm details in writing.
Making the glass
Glass is cut, polished and tempered to your measurements. This takes time, and we tell you what to expect.
Hardware is ordered to match.
Installation day
We protect the bathroom, remove any old door, set the new door level and plumb, seal the edges and adjust the hardware.
We test the swing or glide and clean the glass.
After the install
We explain how to use and clean the door. Silicone needs a short time to cure before heavy water use.
If anything needs a small adjustment, call us. We serve Nashville and the rest of Middle Tennessee.
Quick answers
How long does installation take?
Most installs are done in a single visit, depending on the size and type of enclosure.
Should I be home?
Someone should be home for the start and the walk-through.




